Skip to content

Friday, April 11, 2025

Search

Avalon Streamlines Permitting for Pool Construction

Avalon Logo - USE THIS ONE
Avalon Logo – USE THIS ONE

By Vince Conti

AVALON – Avalon is preparing to eliminate one of the three permits required for pool construction in the borough.
Currently, such construction requires a zoning permit, construction permit and dewatering permit. An upcoming amendment to the municipal code would eliminate the dewatering permit without sacrificing any of the safeguards the borough has in place.
According to Assistant Business Administrator James Waldron, the dewatering permit, a no-fee permit, was put in place to allow the borough to monitor the dewatering process. Improvements in the computer systems that track the process now make the permit superfluous.

Spout Off

Cape May Beach – Hello Trump Fans! It's time to admit that you have been played by the world's 2nd best con man (Putin is still ahead with Trump nipping at his heals) Every move he makes is directed to…

Read More

Dennis Township – In the month of March, THREE (3) NJ teachers were arrested for child abuse related charges: 1.) A Manchester HS high teacher/basketball coach for relationship with a student; 2.) Morris County…

Read More

Wildwood Crest – RFK Jr. made a big announcement that the cause of autism would be solved “by September” with “massive effort” of “hundreds of scientists from around the world.” There is no way, in any logical…

Read More

Most Read

Print Editions

Recommended Articles