STONE HARBOR – Beginning on Monday, Oct. 16, underdeck steel repairs will continue on the Great Channel Bridge that connects Middle Township to Stone Harbor.
In order to safely accommodate this activity, one-way alternative traffic will be in place for the next four weeks. Traffic in both directions will be maintained, however, only one-way alternating traffic will be permitted to cross the bridge. Traffic approaching each side of the bridge will be maintained by a temporary traffic signal which will allow one direction of travel to proceed at a time.
Motorists are urged to use caution when approaching and crossing the bridge and to not proceed until the signal is in the green phase. Slight delays should be expected.