November 16, 2019
AVALON – The wide beaches and high dunes are back. The Army Corps of Engineers completed the 2019 Avalon beach replenishment project Nov. 10. The project was completed ahead of...
AVALON – The wide beaches and high dunes are back. The Army Corps of Engineers completed the 2019 Avalon beach replenishment project Nov. 10. The project was completed ahead of...
AVALON — A rally drew just over two dozen people July 14 at 9:30 a.m. at 53rd Street and Dune Drive; the purpose, to draw attention to the construction of...