Wednesday, May 14, 2025

Search

Exterior, Landscaping Work Commences at Crest Arts Pavilion

The exterior of the Crest Arts Pavilion.

From Wildwood Crest

WILDWOOD CREST – Phase II of the development of the Crest Arts Pavilion at 6301 Ocean Avenue has commenced.

This phase includes landscaping and exterior work to the building, which will remain open under normal operating hours through the construction.

The project, mostly funded through a $1.043 million grant from the Cape May County Open Space Program, includes the following:

– Pull-in parking with designated handicapped parking spaces, as well as four fast-charging electric vehicle parking spaces

– Two gas fire pits surrounded by comfortable seating

– Four picnic benches with free-standing umbrellas

– An oval stage with pergola for entertainment and other uses such as small weddings

– New brick pavers and concrete paths meandering throughout botanical gardens designed to thrive in Wildwood Crest’s coastal environment

– Wayfinding signs

– Bicycle repair station

All of the amenities related to the project are designed to complement the adjacent bike path and views of the beach.

The construction work is being performed by Schiavone Construction Company LLC. Most of the work is scheduled to be complete by early to mid May.

The Crest Arts Pavilion is open Monday through Friday from 9 a.m. to 3:30 p.m. and Saturday from 9 a.m. to 1 p.m. during the winter months.

For more information about this project, contact DeBlasio and Associates, the Borough of Wildwood Crest’s engineering firm, at (609) 854-3311.

Spout Off

Stone Harbor – Could the North Wildwood spouter tell us what kind of company he refers to that has already gotten tariff increases. Waiting for the reply spout!

Read More

Sea Isle City – Great picture of the 82nd street playground in Stone Harbor. Take note, Sea Isle, the shade provided. Maybe inquire and then just like Nike, just do it!

Read More

Most Read

Print Editions

Recommended Articles