MARMORA – Beginning on Wednesday May 21and continuing Thursday May 23 Church Road (CR 602) will be closed during the hours of 7:00am to 5:00pm and traffic will be detoured to allow for the installation of the final surface course paving. Local traffic will be maintained, and residents will always have access to their homes. The roadway will be reopened to through traffic at the end of each day.
During the paving operation, east bound traffic travelling along Tuckahoe Road, Route 9 and Stagecoach Road and wishing to access Church Road will be detoured and directed to continue travelling east to Tuckahoe Road. Similarly, traffic travelling west along Route 9, Tuckahoe Road and Stagecoach Road and wishing to access Church Road north or south will be directed to Butter Road (CR 637).
Motorists are advised to proceed with caution along the detour routes and to exercise extreme caution if travelling along the portion of Church Road that is undergoing paving as there will be limited visibility and a 2 inch drop off along the centerline at the interface of the new and base course paving Wednesday night.