Friday, December 13, 2024

Search

Parkway Construction: Traffic Patterns Announced for Aug. 18-21

Getting off the northbound Garden State Parkway at the temporary Exit 9. This is the access to Stone Harbor Boulevard as well as the exit for Shell Bay Avenue. Photo was taken Aug. 6 at 12:55 p.m.

By

Information provided by NJ Turnpike Authority
WEEK OF AUG. 18 – There’s a long-term detour in place. The ramp at Exit 11 is under construction. Traffic looking to exit onto Stone Harbor Boulevard should follow the detour signs. That detour will be in place until September. 
LANE CLOSURES:
Southbound  MM  11.9 to 7.5 Left Lane 8/18 5am-11am
Southbound  MM  11.9 to 7.5 Right Lane 8/18 11am-4pm
Southbound  MM 11.9 to 7.5 Right Lane 8/19-8/20 5am-4pm
Northbound  MM  7.5 to 11.9 Right Lane 8/18-8/20 5am-3pm 

Spout Off

Cape May – The number one reason I didn’t vote for Donald Trump was January 6th and I found it incredibly sad that so many Americans turned their back on what happened that day when voting. I respect that the…

Read More

Dennis Township – The only thing that trump is going to make great again is total amorality, fraud, rape, treason and crime in general. His whole administration will be a gathering of rapists, russian assets, drunks,…

Read More

Avalon – During the Biden presidency and the Harris campaign, the Democrats told us over and over again that the president has nothing to do with, and can nothing about the price of eggs at the grocery store…

Read More

Most Read

Print Editions

Recommended Articles

Skip to content