Search
Close this search box.

Saturday, September 7, 2024

Search

Route 50 Tuckahoe River Bridge Detour Announced for Memorial Day Weekend

NJDOT Logo

By Press Release

UPPER TOWNSHIP – New Jersey Department of Transportation (NJDOT) officials announced a Route 50 southbound detour to accommodate the holiday weekend summer traffic as the Tuckahoe River Bridge rehabilitation project advances in Cape May County.
NJDOT has been working closely with local officials in Corbin City and Tuckahoe, who requested the detour to help alleviate traffic backups that are expected with the bridge reduced to one lane and an alternating traffic condition. Access to local roads will be maintained for local traffic.
Starting May 28, and continuing through May 30, NJDOT’s contractor South State, Inc., will detour motorists from Route 50 southbound between Mosquito Landing Road and Route 49, past the construction zone to accommodate the expected summer holiday traffic. All motorists will follow the existing southbound truck detour on the following dates and times.
May 28, 2016 from 9 a.m. to 4 p.m.
May 29, 2016 from 2 p.m. to 8 p.m.
May 30, 2016 from 2 p.m. to 8 p.m.
Route 50 Southbound Detour:

  • Motorists traveling on Route 50 southbound will be directed to bear right onto CR637/Cumberland Avenue.
  • From CR637/Cumberland Avenue, make a left onto CR666/Cape May Avenue.
  • Make a left onto Route 49 eastbound.
  • Continue on Route 49 eastbound and make a right onto Route 50 southbound.

Traffic heading to Cape May in the summer may want to use alternate routes because of the ongoing construction.
The $11.7 million federally-funded project, which began in October 2013 will demolish and replace the existing, structurally-deficient bascule lift drawbridge with a new low-level, fixed-span structure over the Tuckahoe River connecting Upper Township in Cape May County with Corbin City in Atlantic County. The project will reconstruct and widen the highway in the vicinity of the bridge, and provide safety and operational improvements at intersections including the addition of new dedicated turn lanes. New sidewalks and curbs will be installed along Route 50 and the existing drainage system will be upgraded. The project is expected to be complete by summer 2017.
Variable message signs and lane closure signs are being utilized throughout the project limits to provide advance notification to motorists of all traffic pattern changes associated with the deck replacement project. Throughout the project, NJDOT will provide information before upcoming road closures.
The precise timing of the work is subject to change due to weather or other factors. Motorists are encouraged to check NJDOT’s traffic information website www.511nj.org for real-time travel information and for NJDOT news follow us on Twitter @NJDOT_info.

Spout Off

Avalon – Maybe deport them instead of destroying what was once a great city! This is ridiculous. New York City launched a pilot program to help migrants transition out of city shelters by providing them with…

Read More

Lower Township – Oh great, it's political sign season. The time of year that our beautiful seashore landscape is trashed with yard signs. Do we really need to know who YOU are voting for?
By the way, your yard…

Read More

Avalon – Former president Jimmy Carter , 99, turned to his son several weeks ago as he watched President Joe Biden, 81, announce that he was passing the torch to a younger generation. “That’s sad,” Carter…

Read More

Most Read

Print Editions

Recommended Articles

Skip to content