Search
Close this search box.

Wednesday, September 18, 2024

Search

DRBA Lists Hearings on Proposed Delaware Memorial Bridge Toll Hike; Ferry Projects Included

CMLF Logo

By Press Release

NEW CASTLE, DEL. – The Delaware River and Bay Authority (DRBA) officials on Nov. 27 announced in a release the schedule for two public hearings to discuss the goals and objectives of a proposed toll increase and detail the critical infrastructure investments required at the bi-state agency’s crossing facilities, the Delaware Memorial Bridge and Cape May – Lewes Ferry.
The authority projects $4.3 million for transfer bridge repairs at the Cape May – Lewes Ferry and $9.5 million for the ferry repowering program.
“We are in the fifth year of a 10-year complete overhaul of the Delaware Memorial Bridge, which is dictated by its age, condition, operating environment and heavy volume of usage,” stated DRBA Executive Director Tom Cook. “Among the components of this overhaul are a ship collision protection system, suspender rope (vertical cable) replacement, major steelwork repairs, paint removal and recoating and a bridge deck repair. All of these projects are necessary to ensure public safety and uninterrupted traffic flow.”
 The DRBA will hold hearings in Delaware and New Jersey to inform stakeholders concerning the goals and objectives of a toll increase at the Delaware Memorial Bridge, detail capital infrastructure investments at the Authority’s aging and heavily utilized crossing facilities, provide information on the proposed new rate structure, and solicit public comment.
Dec. 5
In Delaware on Dec. 5 at 6:30 p.m., a hearing will take place on the main floor of the Vincent A. Julia Center adjacent to the Delaware Memorial Bridge Toll Plaza, conjunction of
I-295 and U.S. Route 9 in New Castle.
Dec. 6
In New Jersey on Dec. 6 at 6:30 p.m., a second public hearing will take place at the Salem Community College Davidow Performing Arts Theatre located in Davidow Hall 460 Hollywood Ave. in Carneys Point Township.
According to the release, revenue projections are insufficient to provide borrowing capacity or cash revenue to fund necessary infrastructure investment projects.
Based on the current toll structure at the Delaware Memorial Bridge, future revenues will be inadequate for the Authority to fund the essential capital infrastructure projects at the crossing facilities, which are expected to cost more than $440 million over the next five years.
The following are some of the major capital projects planned at Delaware Memorial Bridge during the next several years:
Bridge paint removal and recoating ($48.2)
Suspension rope replacement ($24.5 million)
Bridge steelwork repairs ($40.5 million)
Pin and link rehabilitation on both structures of the bridge ($19.7 million)
Ship collision protection system ($45.2 million)
Bridge deck repair ($21.5 million)

Spout Off

West Cape May – The amount of TV shows airing is getting out of hand. Less movies are being produced today than ever before. Instead, people are glued to watching shows that most people never heard of.

Read More

Erma – Federal taxes keep going up and Harris and the Dems want higher taxes but our National Debt never comes down – Why?

Read More

Cape May County – 1st love is young love, you look back and think it wasn't love. But it was love for what you knew it to be. 2nd love will chew you up and spit you out. This love includes great pain, lies,…

Read More

Most Read

Print Editions

Recommended Articles

Skip to content